Bathroom renovations · New Zealand

Bathroom and shower renovations, priced before a tile comes off

We measure your bathroom, draw it to scale and price every line. Build with us and the $395 comes off the job. A partner crew waterproofs and tiles; a licensed plumber and a registered electrician do the rest.

The calculator is free and shows its sources. The visit is $395 incl. GST, credited in full to a contract signed within 6 months.

Sample bathroom, 2.4m × 1.8mA scale plan drawing of a sample bathroom 2.4 metres by 1.8 metres, showing a tiled shower in the top-left corner with its waste and fall, a bath along the right wall, a vanity and basin on the bottom wall, a toilet in the bottom-right corner, the door on the bottom-left, and the extractor fan position. It is a worked example, not a photograph of a real job.Tiled showerBathVanityWCDoor 760Fan, vented out24001800

A sample plan, drawn to scale. It is a worked example, not a photograph of a job. We publish project photos only when they are our own, with the owner's permission.

The numbers, sourced

  • $22,000Typical NZ bathroom renovation, excl. GSTCheckMyBuilder, July 2026
  • $15,000–$35,000Most mid-range jobs, excl. GSTCheckMyBuilder, July 2026
  • 2–6 weeksTypical time on siteCheckMyBuilder, July 2026
  • Oct 2024MBIE decided a shower membrane is exempt internal lining workDetermination 2024/054, 2 October 2024
Why us

One contract, every trade named

  • We measure, draw and price it before you commit to anything.
  • A partner bathroom crew strips out, waterproofs and tiles.
  • A licensed plumber and a registered electrician do the restricted work, and supply their own records.
  • You get the records pack: photographs of what went in behind the tiles, and the product data to go with them.

What we don't claim

No reviews, no ratings, no job counts, no years trading and no guarantees of our own, because we have none yet. No “vetted” partner list. We are not a plumbing company, not an electrical company and not a Licensed Building Practitioner: those trades are subcontracted and named in the contract.

How we decide what goes on this site
The $395 visit

What the visit gets you

About 60 to 75 minutes in your bathroom, then a document set within 5 working days. It is yours whether or not we build the job.

  • A visit of about 60 to 75 minutes: measure, photos, moisture readings, fixture and fan check
  • A scaled plan of the room as it is now, and as proposed
  • A line-item budget range, built from the published bands on this site
  • A consent check against Schedule 1 of the Building Act, with the clause named
  • An asbestos flag and testing route for homes built before 2000
  • A written scope naming which trades do the restricted work
  • All of it within 5 working days of the visit, and yours to keep
Sample proposed planA scale plan drawing of a sample bathroom 2.4 metres by 1.8 metres, showing a tiled shower in the top-left corner with its waste and fall, a bath along the right wall, a vanity and basin on the bottom wall, a toilet in the bottom-right corner, the door on the bottom-left, and the extractor fan position. It is a worked example, not a photograph of a real job.Tiled showerBathVanityWCDoor 760Fan, vented out24001800

Sample only. Drawn from a fictional 2.4m × 1.8m room to show the format, not a job we have done.

How it goes

Measure · Build · Hand over

  1. 1

    Measure

    The $395 visit. A scaled plan, a line-item budget and a consent check within 5 working days. Credited in full to a contract signed within 6 months.

  2. 2

    Build

    A fixed-price contract. Strip-out, repairs, plumbing and electrical rough-in, membrane photographed, tiling, fit-off. Paid in stages: 20 / 35 / 35 / 10.

  3. 3

    Hand over

    A final walkthrough, then the records pack: substrate and membrane photos, the membrane product data and instructions, the plumber's details and any electrical certificate.

How we work

One point of contact, and a contract that names everyone

Bathroom Renovation NZ is the contracting party, so the Building Act implied warranties sit with us rather than being spread across three companies you found separately. One programme, one invoice schedule, one person to ring.

The partner crew, the plumber and the electrician are named in the contract and in the disclosure statement, with their registration details, before you sign anything. We do not publish a team page, because we are not going to fill one with stock photographs.

About the business

Not taking payments yet

We contract a bathroom crew, a licensed plumber and a registered electrician in an area before we sell a visit there. Until that is done in your area, the buttons join a waitlist and nothing is charged.

What has to be true before we take money
Questions

The six we get asked most

How much does a bathroom renovation cost in NZ?

A typical New Zealand bathroom renovation costs about $22,000 excl. GST, with most mid-range jobs between $15,000 and $35,000 and cosmetic refreshes from about $8,000 (CheckMyBuilder, July 2026). Small rooms do not simply scale down: Superior Renovations puts a small-bathroom full renovation at $15,000–25,000 as a New Zealand average, because the trade cost is largely fixed. The budget calculator shows where yours sits and where every band came from.

Do I need a building consent to replace a tiled shower?

Usually not. MBIE Determination 2024/054 (2 October 2024) decided that a wet-area membrane under tiled shower walls is part of the internal linings covered by Schedule 1 clause 12 of the Building Act, so replacing a tiled shower in an existing dwelling did not need consent. The plumbing side sits under clause 35, as long as the total number of sanitary fixtures in the building does not go up and an authorised person does the work. Check your own job with your council before anyone starts. The clauses in full.

Why pay for a visit when other companies come free?

Because a free visit is a sales call, and the plan belongs to whoever paid for it. Ours takes 60 to 75 minutes, includes moisture readings and a consent check, and produces a scaled plan and a line-item budget that are yours to take to anyone. Build with us and the fee comes off the job in full.

Who actually does the plumbing and the waterproofing?

A partner bathroom crew does the strip-out, carpentry, waterproofing and tiling. A licensed plumber does the sanitary plumbing, because the PGDB states homeowners cannot fix or unfix it and the Schedule 1 exemptions only apply to an authorised person. A registered electrician does the lighting and the fan. We are the contracting party and none of those licences are ours. How it works.

When do I pay?

Nothing until there is a fixed-price contract, and then in stages against work that has actually happened: 20% on signing less your visit credit, 35% when strip-out and rough-in are done, 35% when the membrane is photographed and tiling is complete, and 10% on completion released with the records pack. Pricing sets it out.

What if there's asbestos or rot behind the tiles?

WorkSafe says homes built before 1 January 2000 may contain asbestos, including in wet-area linings and under vinyl, and that the only way to confirm it is to test a sample. We flag it at the visit and nothing gets stripped out until it is settled. Rot is priced as a variation before it is fixed, which is why every budget carries a 15–20% contingency line (Superior Renovations).

More questions
Next step

Got a bathroom that needs doing? Let's measure it.

$395 incl. GST, credited in full to a renovation contract signed within 6 months. You keep the plan and the budget either way.

Book a visit